Wind industry installation from Conquest Offshore

Premium Content

14 May 2015

Conquest MB1 barge

Conquest MB1 barge

Conquest Offshore is presenting the Conquest MB1 vessel as a 'game changer' for offshore wind turbine installation.

Conquest MB1 was designed with the engineering of Temporary Works Design and Barge Master. The installation system is suitable for installing monopiles, transition pieces and pre-piling of jackets, a spokesperson from Conquest Offshore said.

The barge is 136 by 36 metres and it can store three monopiles, or up to 16 transition pieces, on deck using a skidding system. In addition, upending can be done on deck or floating, a spokesperson added.

For installing monopiles, the barge has a specially designed motion compensated pile gripper. “While hammering the pile, hydraulic cylinders actively compensate the surge, sway and heave motions of the barge to ensure the verticality within limits,” a spokesperson from Conquest Offshore explained.

AXCS introduces ‘streamlined’ website
Service designed to simplify the process of finding the right equipment, managing service and warranty claims
19-year-old becomes one of world’s youngest MEWP instructors
Lawrence Latham, MD of Latham’s Plant Hire, Repairs and Sales, completes IPAF qualification 
New Skyjack boom for China/Southeast Asia markets
Deliveries of the SJ22 TE+ scheduled to begin in August from Skyjack’s facility in Tianjin