Combi Lift wind farm work

Premium Content

13 April 2017

Six nacelles, weighing 350 tonnes each, have been loaded onto a ship in Bremerhaven before being tra

Six nacelles, weighing 350 tonnes each, have been loaded onto a ship in Bremerhaven before being transported to the Nordsee One wind farm

Bremen, Germany-based heavy lift shipping company Combi Lift is currently involved with the transportation of components for the Nordsee One wind farm, located in the North Sea.

To date, Combi Lift has loaded the first components onto a ship. This included six nacelles weighing 350 tonnes each.

The Nordsee One wind farm has a total area of 41.3 km² and is located in the German part of the North Sea. Once operational, the 54 turbines (manufactured by Senvion) will produce an estimated 1.2 billion kilowatt hours per year. 

A time-lapse video of the loading process can be found at the following link: http://www.combi-lift.net/fileadmin/user_upload/Video/Nordsee_One.mp4   

Donaldson to lift the lid on ArmorSeal in upcoming webinar
Expert panel will discuss new air filtration technology designed to improve durability, serviceability and performance – February 19.
First expert speaker announced for power transition webinar
Moog Construction’s Dr Nate Keller to join panel for February 17 event
Is total cost of ownership now the real measure of equipment value?
As sustainability pressures, technology and rising operating costs reshape construction economics, contractors are looking beyond purchase price to understand what machines truly cost over their lifetime