ALE expands Mega Jack 300 fleet

Premium Content

29 November 2018

UK-headquartered global heavy lift and transportation specialist ALE has expanded its 300 tonne capacity Mega Jack 300 fleet with four new towers that will be available for civils projects throughout Europe.

The Mega Jack 300 jacking system was launched in 2018 and ALE describes it as “a compact and versatile system that offers a superior solution to traditional climbing jacks, across a wide variety of applications”.

The system was designed in-house by ALE’s R&D department with the aim of providing a cost-effective solution to jack-up heavy modules on sites where either space, or time to do the job, is restricted. 16 towers have already been used in Kuwait to jack-up hundreds of pipe rack modules more than 5 metres high.

The four new towers will be delivered to ALE’s UK branch where they will be used on a number of forthcoming bridge projects. They bring the total amount of towers in the Group’s global fleet to more than 20.

Image 1-min

The four new towers will be available for civils projects across Europe

The evolution of electromobility in construction
The case for electric construction equipment is now as much about productivity and business value as it is about sustainability
Why crawler AWPs are becoming essential to modern mining and tunnelling
While excavators, loaders and TBMs dominate the spotlight, crawler aerial work platforms are quietly transforming how mining and tunnelling projects are built, maintained and operated.
Beyond the logo: Why content is the engine of successful B2B brand transformation
KHL Content Studio’s Jon Abrahams on how a new identity may capture attention, but it’s understanding that builds trust