Sarens Supports LNG Plant Project In Mozambique

25 August 2020

Sarens Rough Terrain Crane Offloads Pontoon and Launches Crew Tender on Afungi Peninsula

94107_LNG Mozambique

As Mozambique prepares to develop a liquefied natural gas (LNG) facility on the Afungi Peninsula, it is positioning itself to become the third-largest natural gas exporter in the world, after Qatar and Australia.

As part of this greater initiative, Sarens crew and equipment were called in to support the development of the Early Beach Landing (EBL) site at the Afungi facility, located in the northern region of the country. The EBL is one of several projects underway in preparation for the completion of the liquefied natural gas plant.

To support this aspect of the operation, Sarens used the Terex RT 1120 rough terrain crane to assist in offloading a pontoon alongside the EBL and launching the crew tender from cradles located in the water. We are honoured to have been a part of this ambitious project and would like to thank our client for collaborating with us on this meaningful operation.

Latest News
CM Labs envisages the future
icher-Lanciault, product manager, CM Labs, shares his thoughts on the job site of the future
Spacecraft supports legendary lifting and moving
One of the most revered jobs over the past 40 years was anything to do with the NASA Space Shuttle.
Gordan named Link-Belt transportation manager
Gerald Gordon brings nearly 20 years of experience in the logistics industry.