Tesla’s €3.7bn German Gigafactory hits snag

Premium Content

19 February 2020

tesla factory location

The location of Tesla’s latest proposed Gigafactory

Picture courtesy: YouTube/J.-U. Koehler

Tesla has been ordered to cease all preparation work for its first European Gigafactory, as a German court considers protests from environmentalists.

Entrepreneur Elon Musk’s electric car company proposes to build its €3.7 billion manufacturing plant on a 300-hectare site near Berlin, but its plans have been hampered by protestors who say drinking water could be polluted by its activities.

The Green League has also suggested that deforestation currently underway to make room for the plant is a threat to wildlife.

Tesla has responded to the allegation by saying its plans include the replanting of trees over an area three times the size of the plant itself.

Tesla must now wait for the appeal, reportedly made by the Green League, to be considered before any further work can be undertaken.

The company plans to make its Model 3 sedans and Model Y crossover SUV at the factory.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations