More from Hinkley Point C

Premium Content

11 November 2019

The view south across the Hinkley Point C Construction Site showing the main excavations and pipework for the cooling water systems of unit 1.

The view south across the Hinkley Point C Construction Site showing the main excavations and pipework for the cooling water systems of unit 1

Hinkley Point C, the first new nuclear power station to be built in the UK in over 20 years, is one of the largest construction projects in the world. During peak construction up to 5,600 construction workers will be on site at any one time. Up to 55 tower cranes will work on the project, while Sarens’s 5,000 tonne capacity super heavy lift ring crane, SGC-250 (Big Carl), and Marr Contracting’s Favelle Favco M2480D Heavy Lift Luffing (HLL) tower crane, commonly dubbed ‘the world’s largest luffing jib tower crane’, are already being utilised there.

International Cranes and Specialized Transport’s special Hinkley Point C site report is now available online with additional content including these jaw-dropping drone and time lapse videos, as well as previously unseen photographs.

To read the full feature simply click this link.

 

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations