Denmark-headquartered international freight forwarding and project logistics solutions provider Airland Logistics was responsible for unloading operations, stevedoring, clearance, and delivery of 15 silos for a dairy factory in Southern Jutland region of Denmark.

Airland Logistics took charge of the silos at Esbjerg port and then used specialized trucks to transport them 70 km to the factory. The silos measured up to 25 metres long and 5.32 metres in diameter. The total weight of all 15 silos was 380 tonnes. Due to their size and weight, route surveying was required.

The silos will be used for the expansion of the dairy factory to cater for an increased demand for mozzarella.

Silo move for Airland

Silo move for Airland

Silo move for Airland

Silo move for Airland

Silo move for Airland

Silo move for Airland

Newsletter

Delivered directly to your inbox World Crane Week features the pick of the breaking news stories, product launches, show reports and more!

Sign up for free

Newsletter

Delivered directly to your inbox World Construction Week features the pick of the breaking news stories, product launches, show reports and more!

Go to newsletters