Fagioli installs bridge

26 February 2018

04 overview

The central span of the bridge weighed over 2,000 tonnes

The Indonesian branch of Italian heavy lifting and transport company Fagioli has announced the successful completion of the first part of a bridge installation.

02 load out

The bridge being loaded onto the barge

PT Fagioli Lifting and Transportation Indonesia loaded the central span of the bridge onto a barge in Surabaya, Java Island, Indonesia.

The bridge weighed over 2,000 tonnes and measured 128 metres long.

01 transport

The central span of the bridge measured 128 metres

The barge then sailed to Jayapura, Papua, Indonesia, where it was lifted off using four Fagioli strand jacks, providing a total lift capacity of 4,800 tonnes.

03 installation

Latest News
Platform Basket opens up in Canada
New branch set to grow regional market 
Open for entries: 2024 Working at Height Awards
Submissions are now being accepted for brand-new access and rental awards event from ALH and IPAF
HSC updates 100 and 180 tonne crawler cranes
Stage V engines among changes for third generation lattice crane models