Reports on the ERA convention and IRE show

By Helen Wright and Murray Pollok14 June 2011

Latest News
Sarens performs critical installation at nuclear site
The Tennessee Valley Authority (TVA) initiated a major nuclear refueling and maintenance outage so that four replacement steam generators could be installed at the Watts Bar nuclear plant.
Two leading U.S. construction-economy indicators just abruptly turned south
Architecture billings and nonresidential contractor backlog both showed their first recent weakening but it’s not all bad news
Sarens orders 24 Tadano all terrain cranes
Package of new cranes includes ATs from 55 to 250 tonnes, plus six E-Pack kits, mostly destined for European countries