All-electric Kalmar RTGs to Greece

Premium Content

25 January 2013

Kalmar has signed a contract with Piraeus Container Terminal (PCT) SA in Greece to supply twelve all-electric rubber tyred gantry cranes (RTG).

The RTGs have a 37 tonne lifting capacity and have zero emissions. They are being supplied to increase the port’s stacking capabilities from 2.6 MTEU to 3.1 MTEU per year and to help reduce the port's carbon emissions.

Commenting on the order, Mr Li, PCT deputy general manager, said, "Once we install the 12 RTGs from Kalmar, the stacking capacity of our terminal will increase by 30%, and we believe that our terminal will achieve reduced operating costs with increasing throughputs.”

The cranes are scheduled for delivery in 2013.

The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance
Cutting the scrap: The true cost of a demolition shear
A lower-cost shear can be tempting, but what might contractors discover when they do their due diligence?
How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?