All-electric Kalmar RTGs to Greece

Premium Content

25 January 2013

Kalmar has signed a contract with Piraeus Container Terminal (PCT) SA in Greece to supply twelve all-electric rubber tyred gantry cranes (RTG).

The RTGs have a 37 tonne lifting capacity and have zero emissions. They are being supplied to increase the port’s stacking capabilities from 2.6 MTEU to 3.1 MTEU per year and to help reduce the port's carbon emissions.

Commenting on the order, Mr Li, PCT deputy general manager, said, "Once we install the 12 RTGs from Kalmar, the stacking capacity of our terminal will increase by 30%, and we believe that our terminal will achieve reduced operating costs with increasing throughputs.”

The cranes are scheduled for delivery in 2013.

Why rugged electronics are becoming mission-critical for off-road OEMs
Connectivity and digital controls are reshaping heavy equipment and manufacturers are finding performance depends as much on durable electronics as on the vehicles themselves
How less can be more: Rethinking cooling system design for modern heavy equipment
Smarter airflow, not bigger systems, is aiding engine efficiency and uptime
Kabalen retires; Bray promoted at A1A Software
Bruce Kabalen calls it a day, Brittany Bray promoted