Total Movements was involved in a challenging transport which included moving 700 freight-tonnes of equipment in loads more than 7 metres high.

The cargo was more than 7 metres high

The cargo was transported from the supplier’s plant to a load port on the West coast of India.

A spokesperson for Total Movements said, “Shifting of these oversized pieces within the plant, road transportation from the supplier’s plant to the nearest jetty, barging to the nearest major seaport, and feeding alongside the vessel were all part of our scope.

“The cargo’s COG (centre of gravity) was higher than usual, which posed a significant challenge.

“The nominated loading jetty was a tidal jetty, which necessitated special pilotage and mooring arrangements.

“Our engineering and operational team made site visits, had detailed discussions with multiple stakeholders, technical simulations, to execute this movement.”

Check back soon for more detail on this transport project as it becomes available.

The cargo’s COG (centre of gravity) was higher than usual, posing a significant challenge
Technical simulations helped plan the transportation
How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
JLG takes stake in AI and robotics specialist
Parent company Oshkosh makes equity investment in Nextera Robotics
The evolution of electromobility in construction
The case for electric construction equipment is now as much about productivity and business value as it is about sustainability