Hitachi back to pre-quake production levels

Premium Content

25 May 2011

Hitachi Construction Machinery says it is likely to return to full production capacity this week for the first time since the March 11 Japanese earthquake and tsunami. Five plants, all based in Ibaraki prefecture, were affected by the disaster. At the height of disruption, output fell to 60% of capacity.

The company added that it had returned to full production levels faster than it had first thought, and that this would help it meet increased demand for equipment due to the reconstruction efforts, as well as serving the booming markets of developing Asia.

The Japanese government has estimated that reconstruction could cost as much as JPY 25 trillion (US$ 305 billion).

Inside Zoomlion’s Smart Factory: How digital manufacturing could rewrite the rules for heavy equipment
Zoomlion’s new excavator factory in Changsha is not simply faster or more automated than traditional plants; it represents a fundamental rethink of how construction equipment can be designed, built, and delivered
Donaldson to lift the lid on ArmorSeal in upcoming webinar
Expert panel will discuss new air filtration technology designed to improve durability, serviceability and performance – February 19.
First expert speaker announced for power transition webinar
Moog Construction’s Dr Nate Keller to join panel for February 17 event