North Macedonia’s PV plant to start construction soon

Premium Content

North Macedonia’s Prime Minister Dimitar Kovacevski is reported to have said that the construction of a 100 MW photovoltaic power plant in Oslomej, a PPP project of the state-run power producer ESM, is expected to start construction soon.

Kovachevski in the Assembly of the RSM (Photo: MIA)

Kovacevski said that he expects ESM to launch the construction of another 10 MW solar power plant in Oslomej in 2023.

The country has significant plans to focus on renewable energy projects as part of its wider energy transition. 

The Prime Minister is also said to have pointed out, other projects for the construction of photovoltaic power plants in REC Bitola, with a capacity of between 200 and 300 MW, are being finalised, and in the next two years all 130 MW of photovoltaic power plants should be put into use.

The first large-scale solar plant in North Macedonia, a 10 MW solar plant Oslomej 1 owned by ESM, was reported to be connected to the power grid in April 2022.

Engineering certainty: Lift planning’s expanding role in heavy industry
Driven by tighter critical lift procedures, heavier loads, and shrinking field experience, lift planning now sits at the center of construction execution
Istanbul – the world’s next meeting place
Levent Baykal, organiser of Komatek, the largest construction exhibition in Türkiye, talks to KHL’s Content Studio about his plans to put people at the heart of the show
The future of off-highway power is about integration, not just innovation
OEMs face growing complexity in powertrain decisions – but clarity is emerging around efficiency and uptime