The X-Games calls on Fischbacher

Premium Content

15 July 2013

The X-Games' floating ramp under construction in Munich, Germany

The X-Games' floating ramp under construction in Munich, Germany

The X-Games are considered by many as the Olympic Games for extreme sports, including skateboarding, BMX, mountain biking and rally-car racing.

It was held in Munich, Germany for the first time at the end of June. One of the highlights was Big Air: the world's first floating ramp. The 53° skateboarding and BMX ramp was 26 m high, 112 m long, and was supported by a huge scaffold construction.

The scaffolding for the substructure and the material for the ramp were lifted using a Geda 1500 Z/ZP transport platform. Once the construction had been completed the 1500 Z/ZP was used to bring athletes to their starting positions.

The hoist was supplied by Munich-based rental company Fischbacher. The GEDA 1500 Z/ZP has two control systems and can be used as a pure material lift and a transport platform.

The transport platform control system has a speed of 12 m/min for the transportation of people, and a speed of 24/min for lifting building materials only. It has a load capacity of 2000 kg.

NCCCO Foundation launches Crane Career Advisor program
New resource offering guidance to people interested in working in the crane sector
Engineering certainty: Lift planning’s expanding role in heavy industry
Driven by tighter critical lift procedures, heavier loads, and shrinking field experience, lift planning now sits at the center of construction execution
Istanbul – the world’s next meeting place
Levent Baykal, organiser of Komatek, the largest construction exhibition in Türkiye, talks to KHL’s Content Studio about his plans to put people at the heart of the show