Vinci subsidiary awarded onshore gas pipelines contract

Premium Content

14 March 2016

Spiecapag, a subsidiary of Vinci, has been awarded the contract for three lots of onshore gas pipelines as part of the Trans-Adriatic Pipeline (TAP) project.

One lot, between Kipoi and Kavala, in Greece, is 185km, while the other two lots, between Bilisht and Topoje, in Albania, total 215km.

The TAP will connect to the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, and will cross Greece, Albania and the Adriatic Sea connecting to the Italian gas network. Once completed, the TAP project will transport gas from the Shah Deniz II gas field in Azerbaijan into Europe.

Jean-Claude Van de Wiele, managing director of Spiecapag, said, "We have begun mobilisation of our teams to allow work to start in mid-2016.”

Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity
How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site